BICSI New 2023 RCDDv14.1 Test Tutorial (Updated 322 Questions) [Q162-Q187]

Share

BICSI New 2023 RCDDv14.1 Test Tutorial (Updated 322 Questions)

RCDDv14.1 Exam Questions Dumps, Selling BICSI Products


Earning the RCDD certification demonstrates a high level of expertise in ICT infrastructure design and is highly valued by employers in the industry. The certification also provides opportunities for professional growth and advancement, as well as networking with other certified professionals in the BICSI community.


The BICSI RCDDv14.1 Certification Exam is a globally recognized credential for professionals who design and implement communication distribution systems. The certification program is designed to test the knowledge, skills, and abilities of individuals in the design, implementation, and integration of information and communication technology systems. The exam covers a wide range of topics including structured cabling systems, network design, wireless systems, and data center design. The certification program is intended for professionals who are responsible for designing, implementing, and managing communication distribution systems in commercial and industrial environments.


The BICSI RCDDv14.1 certification exam is a valuable and prestigious credential for ICT professionals who want to enhance their career prospects, demonstrate their expertise, and keep pace with the latest technologies and standards in the industry. The exam covers a wide range of topics related to communication infrastructure and requires extensive preparation, study, and experience. However, the rewards of earning the RCDDv14.1 certification are significant, both in terms of personal satisfaction and professional recognition.

 

NEW QUESTION # 162
Which type of protection for electrical power stations provide isolation against a rise in potential of station ground and also provide drainage protection against longitudinally-induced voltages?

  • A. Mutual drainage reactors
  • B. Neutralizing transformers
  • C. 2-winding neutralizing transformers
  • D. Unit-type neutralizing transformers
  • E. Isolating transformers

Answer: E


NEW QUESTION # 163
Company A recently signed a contract with a strategic business partner, Company B, to jointly roll out a new technology Company B is excited about the joint marketing opportunity Company A's component Quality Assurance team has expressed concerns to you the program manager, Ural the product is being rolled out prematurely and has identified potential issues with backend support systems. QA, however, assures you that a manual work around is possible, but not ideal Company B requests an enhancement to the new product. In a meeting with Company B, you determine that additional funding will be required and resources allocated and scheduled What is your MOST appropriate next step?

  • A. Use the available management reserve
  • B. Advise Company B that funding and resources are not available
  • C. Use an integrated change control process
  • D. Secure funding from another project that was cancelled

Answer: C


NEW QUESTION # 164
Conducted coupling may affect electronic devices primarily through which two of the following means'? (Select two options.)

  • A. Output signal lines
  • B. Input signal lines
  • C. Optical signal lines
  • D. Capacitive coupling (by electric fields)
  • E. inductive coupling (by magnetic fields)

Answer: A,B


NEW QUESTION # 165
After new private equity owners acquire an enterprise, they want to improve its value by reducing costs A new program will restructure the enterprise, including an aging headquarters campus where the main data center is housed A strategic component project presents significant risk to organizational objectives due to Its complexity and dependencies on external parties. After a series of board meetings, the enterprise's investment committee approves a budget to Implement this component project, which will move the old data center from the aging headquarters campus into a new colocation facility Implementation of this component project may now begin, but is already one month behind schedule The program manager now perceives significantly more risk to the larger program due to this delay.
What should the program manager do to address this risk with the program sponsor and governance board?

  • A. Revise the program budget and Implement the component project by managing It closely to recover the month-long delay Next, update the component's project and risk management plans for governance board approval
  • B. Share the concerns with the program sponsor to confirm understanding of the new development Next, update the program budget, implementation plan, and risk management plan for governance board approval
  • C. Update the component project's risk register, issue log, implementation plan, and risk management plan next, meet with the program sponsor to revise the program budget. Implementation plan, and risk management plan for governance board approval
  • D. Update the program budget, and task the component project manager with implementing the plan next, submit a change order for approval to apply more resources to reduce the larger program's risk profile

Answer: B


NEW QUESTION # 166
A country is in the process of strengthening its defense program. A key project is not meeting its specified performance objectives. The project manager initiates a change request to address this issue.
What should the program manager do NEXT?

  • A. Amend the risk register with the key project changes
  • B. Assess the benefits and impact to the program.
  • C. Evaluate the program and re-baseline the objectives
  • D. Consider the option to close out the key project

Answer: B


NEW QUESTION # 167
Stakeholders ask the program manager to assess reasons for the project's delay and provide a report also, the program manager must identify steps to be taken to ensure the program will finish on time and within budget The program manager distributes information in accordance with which of the following?

  • A. Communications management plan
  • B. Program governance charter
  • C. Schedule management plan
  • D. Stakeholder engagement plan

Answer: A


NEW QUESTION # 168
A program manager prepares the program for review to secure funding by senior management. Which of the following must the program manager identify when creating the program charter?

  • A. Process within the organization that will be needed to deliver the product
  • B. Milestone dates, budget, and staff details that support it
  • C. Assumptions incorporated into the benefits management plan
  • D. Key decision makers or stakeholders in the program and their expectations and interests

Answer: D


NEW QUESTION # 169
What should a program manager do to ensure that the program meets the organization's strategic goals?

  • A. Engage the program steering committee
  • B. Analyze the benefits management plan
  • C. Manage the program delivery phase
  • D. Assess the program reports

Answer: B


NEW QUESTION # 170
What is the MINIMUM distance from the edge of a pool or other water hazards for a weatherproof enclosure?

  • A. 1 m (3 ft)
  • B. 4 m (13 ft)
  • C. 10 m (30 ft)
  • D. 6 m (20 ft)
  • E. 2 m (7 ft)

Answer: D


NEW QUESTION # 171
Which of the following terms is often used to describe two parallel paths that have identical conductive terminations to two separate grounding reference points?

  • A. Ground loop
  • B. Conductive loop
  • C. Capacitive loop
  • D. Resistive loop
  • E. Inductive loop

Answer: A


NEW QUESTION # 172
What's the RECOMMENDED twisted pair cable slack length to be left at the work area outlet location to enable the possibility of future changes in the Horizontal Cabling System?

  • A. =0.152 m (0.5 ft)
  • B. =0.3 m (1 ft)
  • C. =1 m (3 ft)
  • D. = 5m (16 40 ft)

Answer: B


NEW QUESTION # 173
The program sponsor requests a weekly performance report. The tools and techniques to monitor and control program performance include which of the following?

  • A. Earned value management financial reporting systems, performance measurement techniques and program management information systems
  • B. Program management performance variances business criteria reweighting, root cause identification, and statistical sampling
  • C. Interviewing, SWOT analysis, run chart and matrix-based charts
  • D. Delphi technique, scatter diagram. Pareto chart, and organization charts

Answer: A


NEW QUESTION # 174
An unforeseen geopolitical risk impacts a program to establish a company's operations abroad. Stakeholders now want to establish a risk response team to define a mitigation plan. Ultimately what appeared to be a significant risk resulted in a negligible risk.
What should the program manager recommend to stakeholders for future similar situations?

  • A. Establish an on-call risk response team
  • B. Seek an expert opinion
  • C. Review the risk severity matrix
  • D. Accept the risk

Answer: D


NEW QUESTION # 175
A global financial system is being delivered by the program learn to allow access from anywhere in the world Following a new cross-border regulation applying to privacy of local banking data accessed from abroad, the CEO of the bank requests that an external audit be conducted lo validate compliance with this new regulation. This event, which was not anticipated al this phase of the program, will generate additional work tor the program learn. This effort Is not included in the current program roadmap and benefits delivery plan What immediate actions should the program manager take?

  • A. De-scope the capabilities of the system to not allow access from abroad
  • B. Assess the impact of the audit and potential remediation on the program
  • C. Accept the risk of the audit and continue the program as planned
  • D. Negotiate with the CEO in an attempt to avoid the audit.

Answer: B


NEW QUESTION # 176
Which of the following transmitter light sources has a MINIMUM bandwidth of 4700 MHz/km (EMB) at 850 nm">

  • A. OM3 (50/125 laser optimized multimode)
  • B. OM4 (50/125 laser optimized multimode)
  • C. OM2 (50/125 multimode)
  • D. OM1 (62 50/125 multimode)

Answer: B


NEW QUESTION # 177
When designing a video communications network, which type of video communication link is two-person videoconferencing?

  • A. Point-to-multipoint unidirectional
  • B. PTP bidirectional
  • C. PTP unidirectional
  • D. Point-to-multipoint bidirectional
  • E. Unidirectional

Answer: C


NEW QUESTION # 178
A design build firm has been retained by a client to construct an outpatient clinic. The client has hired an ICT distribution designer to review the DB firm's work product ensuring that the certified (mat documents are complete. In what capacity would the designer MOST LIKELY be serving?

  • A. Quality Assurance (QA)
  • B. ICT Designer of Record (DOR)
  • C. Project Management (PM)
  • D. Quality Control (QC)

Answer: A


NEW QUESTION # 179
The program manager defines the program objectives, requirements and develops a high-level road map. To ensure program alignment with the enterprise strategic plan the program manager should work with which of the following?

  • A. Project managers on the program
  • B. Change control board
  • C. Program management office
  • D. Program governance board

Answer: D


NEW QUESTION # 180
Component project managers create project management plans for all component projects in a program. The program manager notices that some project managers prefer one status report template while others prefer another How should the program manager decide which template is appropriate?

  • A. Review the issue with the program management office (PMO) to determine which template to use
  • B. Meet with the program governance board to select an appropriate template
  • C. Allow the component project managers to use their preferred templates
  • D. Review the issue with the project managers and come to mutual agreement on which template to use

Answer: A


NEW QUESTION # 181
Which two of the following items should be considered for inclusion in a comprehensive working outline of a SoW? (Select two options.)

  • A. Legal matters
  • B. Financial matters
  • C. Technical considerations
  • D. Contract administration
  • E. Schedule

Answer: C,E


NEW QUESTION # 182
Which of the following team members is responsible for ensuring compliance with me contract documents (CD)?

  • A. Architect
  • B. lCT Distribution Designer
  • C. Owner
  • D. Construction Manager (CM)

Answer: B


NEW QUESTION # 183
A utility company manages its capital improvement projects (CIP) using engineers, project managers, and program managers. A new sponsor from the utility company assesses the CIP and decides to reorganize it into a program. They invite seven companies to discuss their approach to monitor and control the program and its constituent protects.
Where should the program manager incorporate this input?

  • A. Vendor management matrix
  • B. Program management plan
  • C. Stakeholder register
  • D. Program risk management plan

Answer: B


NEW QUESTION # 184
A program manager initiates a new global program to create a higher level of protection for a company's intellectual property. The company exhibits a relaxed culture and environment and is intolerant of processes to the point of being considered process-adverse However, the company's culture is tolerant of long-term program activities, and provided there is continuous progress on improving the protection of its intellectual property Expectations for rapid progress are low What should the program manager do next?

  • A. Insist on maintaining a set of tightly controlled stakeholder register and engagement plan documents to meet expectations
  • B. Ensure that the component stakeholders have the appropriate level of communications required to meet their needs
  • C. Tailor program sponsor and stakeholder engagement and communications activities to meet the company's expectations.
  • D. Provide detailed information to the most influential program sponsors and stakeholders

Answer: B


NEW QUESTION # 185
An initiative involves the development of new technology and leverages existing technologies It is determined critical by the program governance board and the program sponsor that a comprehensive risk management plan be put in place. In what phase is the nsk management plan created?

  • A. Program delivery
  • B. Program definition
  • C. Program execution management
  • D. Program risk management planning

Answer: B


NEW QUESTION # 186
During the program execution stage the component project manager responsible for testing estimates that budgeted hours may exceed 200 hours. What should the program manager do?

  • A. Determine which component protects have excess capacity and rebalance those resources to the project that needs additional hours
  • B. Communicate to the program sponsor regarding the additional estimated cost and request a change order
  • C. Talk with the project manager and find ways to reduce hours in another part of the project
  • D. Request that the project manager make the team members work additional hours and not bill the protect

Answer: C


NEW QUESTION # 187
......