How does an implementation consultant support the customer during Fit-to-Standard workshops?
Note: There are 2 correct answers to this question.
- A. Conduct end-user training on all active scope items.
- B. Demonstrate SAP Best Practices in the starter system.
- C. Highlight gaps that require decisions on configuration or extensibility.
- D. Determine set up instructions for Customer-Driven Integrations.
Answer: B,C
NEW QUESTION # 86
How are capacities considered in planning in the Perform Production Capacity Planning and Evaluation (31L) scope item?
- A. Material Requirements Planning (MPR) delivers capacity requirements. Overloads are identified by ^ capacity evaluation. In case of bottleneck overloads the MRP is started again.
- B. Material Requirements Planning (MPR) delivers capacity requirements. Overloads are identified and ^ worked on subsequently. Conversion to production orders is part of the process.
- C. Material Requirements Planning (MPR) delivers capacity requirements that are leveled simultaneously with available capacity. Remaining overloads are indicated by overload alerts.
- D. Material Requirements Planning (MPR) does NOT deliver capacity requirements. These are created in a separate step in capacity planning. Leveling is done only afeter conversion.
Answer: A
NEW QUESTION # 87
In the SAP Ariba payment and discount management process, which step comes immediately after the "suggest a discount for early processing" step?
- A. Update payment proposal
- B. Start payment run
- C. Evaluate payment suggestion
- D. Release invoice for payment
Answer: C
NEW QUESTION # 88
What is achieved with the integration between SAP Concur and Predictive Accounting?
- A. Real-time budget check when transferring travel requests
- B. Travel planning for the fiscal year based on historic data
- C. Automatic expense payment with upcoming payroll run
- D. Travel request budget check reporting for approver reviews
Answer: A
NEW QUESTION # 89
When a purchase order is created in the headquarters system in the Subsidiary as Production Unit and Internal Supplier to Headquarters (21T) scope item, what is automatically uploaded to the subsidiary system?
- A. A production order
- B. A sales order
- C. A purchase requisition
- D. A planned order
Answer: B
NEW QUESTION # 90
What are customers able to scope in SAP S/4 HANA Cloud with Central Business Configuration (CBC)? (3 correct)
- A. Public sector processes
- B. Scope extensions
- C. Non-standard scenarios
- D. Pre-defined scenario bundles
- E. Countries where business processes will run
Answer: C,D,E
NEW QUESTION # 91
Which activities can you execute in the Maintain Business Roles SAP Fiori app? (2 correct)
- A. Assign authorization profiles to a business role
- B. Maintain catalog roles
- C. Assign business catalogs to a business role
- D. Maintain general restrictions
Answer: A,C
NEW QUESTION # 92
What tasks can you perform from the Display Technical Users app? Note: There are 2 Correct answers to this question
- A. Lock and unlock the initial user account that is delivered with the new system.
- B. Change the username and password of a print user.
- C. Assign and unassign users to user groups.
- D. Upload a certificate for a communication user.
Answer: A,B
NEW QUESTION # 93
You change the status of one of your Kanban containers on the Kanban board. How does the Kanban board sort the Kanban containers? (2 correct)
- A. The original sequence stays as before - the changed container position is kept
- B. Inmediately according to the status sequence (wait - empty - in process -, etc.)
- C. According to the status sequence (wait - empty - in process -, etc.) right after refresh of the list
- D. The changed container is moved to the first position of the original sequence
Answer: A,C
NEW QUESTION # 94
When migrating data for the number range object for Business Partners, why do we occasionally the number range? (2 correct)
- A. Different users try to migrate data to the same migration object simultaneously
- B. Different users try to migrate data to different migration objects simultaneously
- C. The numbers being loaded into the buffer is 15
- D. The migration object has buffering enabled
Answer: A,D
NEW QUESTION # 95
In what phase of the SAP Activate methodology do you test the business processes?
- A. Run
- B. Deploy
- C. Realize
- D. Explore
Answer: C
NEW QUESTION # 96
What are your options if an out-of-the-box integration between SAP S/4 HANA Cloud and another SAP solution is NOT available? (2 correct)
- A. Unrestricted firewall
- B. Infrastructure as a Service
- C. Whitelisted APIs
- D. Integration tools
Answer: B,C
NEW QUESTION # 97
Why is de-coupling your extensions from SAP S/4 HANA Cloud required? (2 correct)
- A. To enhance existing functionality within the application itself
- B. To guarantee the stability of the system
- C. To ensure extensions do not conflict with SAP software updates
- D. To allow customers to take advantage of predefined user exits
Answer: B,C
NEW QUESTION # 98
Which process does the new identity and Access Management app Manage Business Role Changes After Upgrade support?
- A. Initial system deployment
- B. Transfers from quality system
- C. Quarterly system upgrades
- D. New extensibility implementations
Answer: C
NEW QUESTION # 99
Which of the following are outcomes of the Fit-to-Standard workshop? (3 correct)
- A. Gap identification and mitigation
- B. Identification of source code changes
- C. System landscape optimization
- D. Expert configuration definition
- E. Solution impact on business processes
Answer: A,D,E
NEW QUESTION # 100
You need to integrate the headquarters of a company running on SAP S/4HANA will a subsidiary running on SAP S/4HANA Cloud. In a 2-tier ERP scenario, which integration technologies can you use? Note: There are 2 correct answers to this question.
- A. SAP Cloud Integration Automation Service
- B. SAP Cloud Connector
- C. SAP Process Orchestration
- D. SAP Open Connectors
Answer: B,C
NEW QUESTION # 101
You selected "Rejection" in the usage decision of the Quality Management in item. Where can you post the quality inspection stock to? (3 correct)
- A. To blocked stock in a different storage location
- B. To unrestricted stock in a different storage location
- C. To unrestricted stock in the same storage location
- D. To Scrap
- E. To blocked stock in the same storage location
Answer: B,C,E
NEW QUESTION # 102
How is the productive system configured? (2 correct)
- A. Through Central Business Configuration (CBC) in SAP Cloud Platform
- B. Directly with manual rework configuration items (SSCUIs)
- C. Through transports from the quality system
- D. Via the Cloud Application Lifecycle Management (CALM) Implementation Portal
Answer: B,C
NEW QUESTION # 103
You reviewed the project scope and identified the corresponding resources. Based on the SAP Activate methodology, which activities must you perform in the Explore phase? (2 correct)
- A. Use the Quality system to demonstrate SAP Best Practices processes
- B. Conduct the Fit-to-Standard workshops to identify fits, gaps, and perceived gaps
- C. Use the Starter system to demonstrate SAP Best Practices processes
- D. Configure the organizational structure and chart of accounts in the system
Answer: A,C
NEW QUESTION # 104
Which cloud computing service enables you to build and deploy applications?
- A. IaaS
- B. SaaS
- C. PaaS
- D. IPaaS
Answer: C
NEW QUESTION # 105
......
Valid C-S4CMA-2308 Exam Dumps Ensure you a HIGH SCORE: https://www.passleadervce.com/SAP-Certified-Application-Associate/reliable-C-S4CMA-2308-exam-learning-guide.html
Pass C-S4CMA-2308 Exam with Latest Questions: https://drive.google.com/open?id=1Ohpzu0humyVoOA-veeDpA6eR5tuMyTzM