Get New 2021 Microsoft exam MB-320 Dumps Bundle On flat Updated Dumps!
Full MB-320 Practice Test and 145 unique questions with explanations waiting just for you, get it now!
NEW QUESTION 25
A company produces lotions for pain relief and uses Dynamics 365 for Finance and Operations.
You have been provided the following information for a new relieving lotion.
Use the drop-down menus to select the answer choice that completes each statement based on the information presented in the graphic.
NOTE: Each correct selection is worth one point.
Answer:
Explanation:
Explanation
NEW QUESTION 26
You need to set up the configuration model to price the motorcycles correctly. What should you do?
- A. Set Order type in price model to Sales Order and Pricing method in Version to Cost based.
- B. Set Order type in price model to Sales Order and Pricing method in Version to Attribute based
- C. Set Order type in price model to Sales Quotation and Pricing method in Version to Attribute based.
- D. Set Order type in price model to Sales Quotation and Pricing method in Version to Cost based
Answer: D
NEW QUESTION 27
You need to configure production control parameters for liquid cleaning solution manufacturing.
What are two possible ways to achieve this goal? Each correct answer presents a complete solution.
NOTE: Each correct selection is worth one point.
- A. Select the Block editing option only.
D18912E1457D5D1DDCBD40AB3BF70D5D - B. Select Block editing and approve the formula.
- C. Select the Block removal of approval option for the formula
- D. Require an electronic signature when the formula is approved.
Answer: B,C
Explanation:
Reference:
https://docs.microsoft.com/en-us/dynamics365/supply-chain/production-control/formulas-versions
NEW QUESTION 28
A company produces multiple products that require an installation kit that includes 50 components.
The company does not want to include these 50 components in every Bill of materials (BOM). You have a BOM kit that includes all 50 components, but you do not want it to produce a separate production order.
You need to set up the product BOM for the finished good.
What should you do?
- A. Select Phantom on the engineering fast tab on the kit item.
- B. Change the line type to Phantom.
- C. Change the coverage group on the kit item to Manual.
- D. Change the line type to Pegged supply.
Answer: B
NEW QUESTION 29
You maintain responsible resource calendars and production orders for a manufacturing company. All production resources use the same production calendar.
A machine in the facility is defective and must be closed for repairs for the next two days.
You need to configure the resource calendar to close the resource for production for the next two days.
What should you do?
- A. Navigate to the resource group. Change the calendar to closed on the resource group.
- B. Navigate to the resource. Change the calendar to closed on the resource.
- C. Navigate to the calendar used for production and close the next two days.
- D. Navigate to the resource and select . Set the calendar to closed for the next two days.
Answer: D
NEW QUESTION 30
A company is looking to use Dynamics 365 Supply Chain Management.
The company is in the process of redesigning and retooling an existing manufacturing plant to group similar, cellular operations to improve efficiency and minimize wasted time between operations. They want to locate raw materials close to where they are needed without losing reorder visibility.
You need to set up their environment.
Which kind of production type should you implement?
- A. Discrete manufacturing
- B. Manufacturing execution
- C. Process manufacturing
- D. Lean manufacturing
Answer: D
NEW QUESTION 31
You are the lead product design engineer at a plastics manufacturing company. You implement a new process that uses a single tool to produce three finished goods at the same time.
You need to set up the planning item number and formula to correctly to manufacture the three items.
Which three actions should you perform? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.
- A. Specify each of the finished good items as co-products
- B. Create item number for planning item and the associated formula
- C. Add a coverage group to the formula
- D. Add minimum and maximum quantities on formula
- E. Assign co-products to the formula
Answer: A,B,E
Explanation:
Section: Create, process, and manage production batch orders
NEW QUESTION 32
A customer produces light projection toys for holiday decorations throughout the year.
You must implement Bills of material (BOMs) for the product lifecycle. The solution must meet the following requirements:
You need to create a BOM for each phase.
Which BOM types should you use? To answer, select the appropriate configuration options in the answer area.
NOTE: Each correct selection is worth one point.
Answer:
Explanation:
NEW QUESTION 33
A manufacturing company uses discreet manufacturing to make skateboards. Production order picking lists are manually posted after finished goods are reported as finished.
A production order has six picking lists posted. The quantities on the picking lists do not match any of the reported or finished quantities. This causes an inventory error for the raw materials. All raw material transactions must be tracked on production order and reconciled.
You need to process a single picking list for each production order.
What should you do first?
- A. Delete the six posted picking list journals
- B. Create a production picking list. When creating lines select option Full reversal.
- C. Create a counting journal to reconcile the inventory that was posted in error.
- D. Create a movement journal and select the proper account for production postings to reconcile the inventory that was posted in error
Answer: B
NEW QUESTION 34
You are a functional consultant for Contoso Entertainment System USA (USMF).
USMF plans to categorize a new night shift in its factory.
You need to create a new cost category named NightShift for the night shift.
To complete this task, sign in to Dynamics 365 portal.
Answer:
Explanation:
See explanation below.
* Go to Organization Administration
* Click New to create a new shared category.
* Give the shared category an ID and a name (NightShift).
* Select the Can be used in Production
* Back in Organization Administration Categories.
* Click New to create a new category.
* Select the Category ID from the shared category.
* The category will inherit the ID and name (Nightshift) from the shared category.
* Click Close to close the window.
NEW QUESTION 35
A company implements Dynamics 365 for Finance and Operations. You must use functionality in the system for group production runs to prevent downtime and excessive cleaning of the machines on the production line.
You need to set up the system.
Which behaviors should you expect? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.
Answer:
Explanation:
NEW QUESTION 36
A manufacturing plant uses Lean manufacturing. Operators process Kanban consumption manually by using a mobile device.
The production team must use automatic empty registration for some of the event Kanbans. Registration must occur when the last job of a Kanban is completed.
You need to update the Kanban rule to meet this requirement.
What Kanban setting should you update?
- A. Select to register as empty when the source requirement is registered.
- B. Set a fixed Kanban quantity.
- C. Select to manually register as empty.
- D. Select to register as empty when handling units are received.
Answer: D
Explanation:
Explanation
References:
https://docs.microsoft.com/en-us/dynamics365/supply-chain/cost-management/backflush-costing
NEW QUESTION 37
A company is looking to use Dynamics 365 for Finance and Operations.
The company is in the process of redesigning and retooling an existing manufacturing plant to group similar, cellular operations to improve efficiency and minimize wasted time between operations. They want to locate raw materials close to where they are needed without losing reorder visibility.
You need to set up their environment.
Which kind of production type should you implement?
- A. Discrete manufacturing
- B. Manufacturing execution
- C. Process manufacturing
- D. Lean manufacturing
Answer: D
Explanation:
Section: Set up and configure manufacturing
NEW QUESTION 38
A company makes lubricants and greases used in the automotive industry. The company plans to implement Dynamics 365 for Finance and Operations. The system must meet the following requirements:
* Schedule the batch production of products.
* Plan for inventory fluctuations of ingredients that are used across different products.
* Schedule delivery of amounts of proprietary compounds used during production from vendors to keep production runs on schedule and eliminating excess stock on hand or delayed production.
The company is starting the initial setup of their Dynamics 365 environment.
Answer:
Explanation:
NEW QUESTION 39
You have updated a cost category price from $5.00 to S7.00. You process a production order which uses the cost category. After ending the order, you realize a new standard cost was not calculated after the price update.
You need to validate how this impacted the financial voucher transactions. What transaction would you see in the general ledger?
- A. $2.00 debit to the production quantity variance account
- B. $2.00 debit to the production price variance account
- C. $2.00 credit to the production price variance account
- D. $2.00 credit to the lot size variance account
Answer: B
NEW QUESTION 40
A company uses Process manufacturing for most products and Discreet manufacturing for other products. The company is creating a formula for a new product. The new item will be used to make a name brand product and two generic brand products.
This item has the following requirements:
* Production of the name brand and generic products must use the same formula.
* The company must produce all three items at the same time.
You need to create a produced item that can make two generic items and one main item.
How should you set up the item?
- A. Create the name brand item as a Bills of material production type item.
Add the two generic items on the Bills of material for the name brand product and use line type phantom. - B. Create the name brand product as the main product and use a formula production type.
Create the two generic products as co-products as part of the formula for the name brand product. - C. Create the name brand product as the main product and use a formula production type.
Create the two generic items as a formula planning production type planning items.
Copy the formula from the name brand item into each of the generic items. - D. Create the name brand item as a Bills of material production type item.
Create the two generic items as a sub-assembly on the Bills of material for the name brand product.
Answer: B
NEW QUESTION 41
......
[Sep-2021] Pass Microsoft MB-320 Exam in First Attempt Guaranteed: https://drive.google.com/open?id=1HSvqO2veUPbwsI7w3Z5SuZEgJ-pCWH3K
Reduce Your Chance of Failure in MB-320 Exam: https://www.passleadervce.com/Microsoft-Dynamics-365/reliable-MB-320-exam-learning-guide.html