NEW QUESTION 61
You have a customer located on the east coast of the US (UTC -5hr, assuming Standard Time). Smart Location stores the times from incoming coordinates in UTC.
To ensure that an external system sending the coordinates addresses the offset between the local time and UTC, which <time> element within a Smart Location API "set_position" request would be correct?
- A. <time>2017-04-07T14 :40:00-05:00</time>
- B. <time>2017-04-07T14:40:00-0500</time>
- C. <time>20l7-04-07T14:40:00ET</time>
- D. <time>2017-04-07T14:40:00Z</time>
Answer: C
NEW QUESTION 62
You configured an "early morning" time slot between 06:00 and 09:00 for the"Installation' Activity An installation activity with no SLA is assigned to a resource for tomorrow.
Which two statements are correct regarding how activities in Jeopardy will be displayed for this configuration?
- A. A jeopardy warning will be displayed on the Resource Tree only
- B. A jeopardy warning will be displayed if this activity has not started and finished between 06:00 and 09:00 tomorrow.
- C. A jeopardy warning will be displayed on Time/List/Map Views only.
- D. A jeopardy warning will be displayed on the Resource Tree and Time/List/Map Views.
- E. A jeopardy warning will be displayed if this activity has not started between 06:00 and 09:00 tomorrow.
- F. A jeopardy warning will be displayed if this activity has not finished between 06:00 and 09:00 tomorrow.
Answer: A,D
NEW QUESTION 63
Your customer noticed a message that sometimes appears when they are moving activities between resources. The message reads "Soft skill mismatch" and the customer wants it changed to read "Resource does not meet Preferable work skill level".
Which option fulfills that requirement?
- A. From My Display, enable "Show Placeholder IDs', then turn the Glossary Editor on. When the original message appears when moving an activity, click the ID of the message and modify it to the new terminology.
- B. From the Glossary, update the wording for the "Soft skill mismatch' entry within the "Move Activity Result' category.
- C. From the Glossary, update the wording for the "Soft skill mismatch' entry within the "Move Activity to Resource Alert' category.
- D. From the Glossary, update the wording for the "Soft skill mismatch' entry within the "Activity Warning' category.
Answer: C
NEW QUESTION 64
Your customer wants to configure an inner step message ("B") to send an email if a previous messa ("A") has Failed.
Which statement explains how this can be supported?
- A. In the Message Scenario screen's Blocking Conditions tab of message B, add a condition that blocks the message when the message A's status is NOT IN failed.
- B. In the Message Scenario screen's Next Steps tab of message A, add message B as the Next Message Step with the final status "Failed".
- C. In the Message Scenario screen's Blocking Conditions tab of message B, add a condition that blocks the message when the message A's status is NOT IN sent.
- D. In the Message Scenario screen's Next Steps tab of message B, add message A as the Next Message Step with the final status "Failed".
Answer: A
NEW QUESTION 65
A utility company sees several 'New Connect' activities being added to the routing bucket throughout the day.
They want 'Meter Read' activities to potentially be removed from the technician's route so that the 'New Connect' activities can be assigned if the technician qualifies for the activity.
They enabled reoptimization in their routing plan and created a reoptimization filter targeting the 'Meter Read' activities.
What additional settings are required in the routing plan to meet the desired behavior?
- A. Set the reoptimization goal to "Reduce Overdue". Then, using routing filters, set the cost of not assigning 'Meter Read activities in existing routes to 'High', and the cost of not assigning 'New Connect' activities in the routing bucket to 'Normal'.
- B. Set the reoptimization goal to 'Assign high priority activities'. Then, using routing filters, set the cost of not assigning 'Meter Read activities in existing routes to 'Low', and the cost of not assigning 'New Connect' activities in the routing bucket to 'High'.
- C. Set the reoptimization goal to 'Assign high priority activities'. Then, using routing filters, set the cost of not assigning 'Meter Read activities in existing routes to 'High', and the cost of not assigning 'New Connect' activities in the routing bucket to 'Low'.
- D. Set the reoptimization goal to 'Assign high priority activities'. Then, using routing filters, set the cost of not assigning 'Meter Read activities in existing routes to 'Highest', and the cost of not assigning 'New Connect' activities in the routing bucket to 'Normal'.
Answer: A
NEW QUESTION 66
Your customer has a group of technicians who are working in the following rotating shifts:
- Two consecutive weeks: Monday through Friday from 8 AM to 5 PM
- Next two consecutive weeks: Monday through Friday from 9 AM to 6 PM and also Saturday from 11 AM to 1 PM
- During the Monday through Friday shifts, lunch is every day at 1 PM.
Which configuration supports this rotating shift requirement?
- A. Create one shift with two "working time" calendars and include a repeating activity for lunch.
- B. Create one shift with two work schedules. Each work schedule must include a repeating act for lunch.
- C. Create one work schedule with three shifts. Two of those shifts must include a repeating activity for lunch.
- D. Create a work schedule with three shifts. Each shift must include a repeating activity for lunch.
- E. Create a work schedule with two shifts. Each of those shifts must include a repeating activity for lunch.
Answer: E
NEW QUESTION 67
A company has just expanded it's serviceable area in Europe to include coverage in Germany. As a result, many new users will need the OFSC interface screens to display in German.
Which of the following statements is correct about OFSC's capabilities for addressing this new requirement?
- A. Once Germany is added as an "Available Country" from the Business Rules configuration screen, then the corresponding translations can be viewed and modified via the Glossary.
- B. Once Germany is added as a "Language" from the Display configuration screen, then the corresponding translations can be viewed and modified via the Glossary.
- C. Translations to OFSC native fields can be made using the Glossary export/import functionality, but custom properties can only be translated by exporting/importing the Properties list.
- D. Translations to OFSC native fields and custom properties can be made using either the Properties or Glossary export/import functionality.
Answer: A
NEW QUESTION 68
A customer has chosen to override learned activity durations for a period of time, after which they will revert bads; to having Oracle Field Service Cloud (OFSC) provide duration estimations based on learned behavior.
Which statement is accurate regarding how the statistics override option works?
- A. Even though an activity duration override is in effect, OFSC still compiles statistically learned values from reported field activities.
- B. An activity duration overrides can be applied for a type of activity even if a given resource has not yet completed an activity of that type.
- C. OFSC will begin updating statistically learned values from reported field activities once the override has stopped.
- D. Activity duration overrides can only be started or stopped manually within the OFSC Core Application.
Answer: D
NEW QUESTION 69
Which three options are valid 'Units of measure' in a Resource Type's[ 'Load Threshold' section, that are used to determine how the icons are displayed in the Dispatch Console based on the resource's current load?
- A. Hours
- B. Travel time cost
- C. Working hours cost
- D. Time percent
- E. Overtime cost
- F. Number of activities
Answer: A,B,F
NEW QUESTION 70
Which three configurations will enable booking to automatically close?
- A. specific work zones at designated times, based on intersections of capacity categories and time slots, set for either the same day or from 1-5 days earlier
- B. specific capacity intervals at designated times, set for either the same day or from 1-5 days earlier
- C. specific booking intervals at designated times, set for either the same day or from 1-5 days earlier
- D. specific work zones at designated times, based on intersections of capacity categories and booking intervals, set for either the same day or from 1-5 days earlier
- E. specific work zones at designated times, based on booking intervals including All Day intervals, set for either the same day or from 1-5 days earlier
Answer: A,D,E
NEW QUESTION 71
Which two statements are true regarding integrations between OFSC and DBaaS?
- A. Integration supports the transfer of OFSC data directly into DBaaS either in bulk once per day or automatically in real-time.
- B. Customers with a BICS instance can use DBaaS as a data source for data migration to extend the current BICS data limit.
- C. DBaaS integration enables OFSC to act as a system of record for activity data.
- D. Integration enables automatic bulk import of DBaaS data directly into OFSC as part of the Daily Upload file.
Answer: A,B
NEW QUESTION 72
A customer is using the following within the "get_capacity" request of the SOAP Capacity API.
<date>2017-05-10</date>
<date>2017-05-15</date>
<location>general</location>
Given the body of the request, which statement is true regarding the dates that will be returned in the response?
- A. Only if there is quota available, the customer will obtain results for dates between May 10th and May 15th.
- B. The customer will obtain results for dates between May 10th and May 15th, excluding May 15th.
- C. The customer will obtain results for dates between May 10th and May 15th, both inclusive.
- D. The customer will obtain results for dates May 10th and May 15th.
Answer: D
NEW QUESTION 73
Which two statements are correct regarding the characteristics of an SLA window?
- A. An SLA window indicates that there is enough time available within it to perform an activity.
- B. An SLA window indicates when an activity should start.
- C. An SLA window indicates when an activity should be completed.
- D. An SLA window indicates how long an activity should take to complete.
Answer: B,C
NEW QUESTION 74
Which two settings must be configured to ensure that an alert will display in the Dispatch Console when a resource does NOT activate their route on time?
- A. Select the "Enable 'Not activated in time' alert and trigger" within the appropriate Resource Types configuration screen.
- B. Configure the "Route has not been started XX minutes after the start time of resource work day" alert setting from the Display screen.
- C. Create a resource filter that has an "Activated contains Activated" condition for use in the List/Time/Map/Daily views.
- D. Configure a message associated with the "Route is not activated" launch condition within a Message Scenario.
Answer: A,B
NEW QUESTION 75
Your customer wants their field technicians to identify potential upsell opportunities for a premium service they offer by asking their customer whether they would be interested in receiving a free three-month trial.
The technician needs to capture and validate customer details to complete this three-month trial. Which three configurations meet this requirement?
- A. Create a String property with a Phone element and use a Regular Expression to ensure onl.
properly formatted phone number can be entered if the customer would like to receive additional information - B. Create a String property with an Email element and use Formatting to ensure that only a valid email address can be entered if the customer would like to receive additional information.
- C. Create an Integer property with two check boxes, one for "Yes" and another for "No".
- D. Create a File property with a Signature element for customers to complete if they are interested in receiving the trial.
- E. Create an Enumeration property with two radio buttons, one for "Yes" and another for "No".
Answer: B,D,E
NEW QUESTION 76
Your customer wants to update technician inventory using the Inbound API using the following:
Given the <head> node of this request, which two statements are correct?
- A. Required inventory can be specified
- B. Only inventory in a technician's pool will be affected
- C. Customer inventory will be updated
- D. Only serialized inventory will be updated.
- E. Any existing inventory not listed in the body of the request will be deleted
Answer: D,E
NEW QUESTION 77
......
Oracle 1z0-1003-22 Exam Syllabus Topics:
| Topic | Details |
|---|---|
| Topic 1 |
|
| Topic 2 |
|
| Topic 3 |
|
| Topic 4 |
|
| Topic 5 |
|
| Topic 6 |
|
| Topic 7 |
|
| Topic 8 |
|
| Topic 9 |
|
1z0-1003-22 Practice Test Give You First Time Success with 100% Money Back Guarantee!: https://www.passleadervce.com/Oracle-Field-Service-Cloud-Service/reliable-1z0-1003-22-exam-learning-guide.html